Glencore vegetable oil pahese II
Foktő

Glencore vegetable oil pahese II

Project type
General construction
Project profile
Design and engineering
Construction and steel structure works
Industrial technology
Electrical, instrumentation, and control engineering works
Activities
Prefabrication and installation of pipelines for technology and technology support
Installation of technological and process support equipment
Client
Cimbria / Pannon Növényolajgyár (Glencore)
Year of completion
Industry
Food Industry – Phase 2, Grain Processing
Volume
5-10 million EUR
Staff
20-120 persons
Scope of work
  • Manufacturing, setup, commissioning of 620,000 t/year capacity vegetable oil plant grain processing, air and exhaust systems.
  • Design, manufacturing and erection of steel structures.
  • Installation and setup of equipment.
  • Installation of pipe systems.
  • Installation of electric and control engineering.
  • Installation of vertical and horizontal linear facilities, where the building has a supporting function as well. During construction technology determined the process of the activities performed.