Samsung SDI boiler house I
Göd

Samsung SDI boiler house I

Project type
Technological solutions
Project profile
Design and engineering
Construction and steel structure works
Industrial technology
Electrical, instrumentation, and control engineering works
Activities
Prefabrication and installation of pipelines for technology and technology support
Installation of technological and process support equipment
Manufacture and installation of pressure vessels (PED), tanks and silos
Installation of boilers and related accessories
Client
Kazántrade Plc.
Year of completion
Industry
Battery Plant
Volume
1-2 million EUR
Staff
40-50 persons
Scope of work
  • Preparation of complete design documentation for the technology of 5 steam boilers  8 ton/h/pcs: steel structure, building electricity, mechanical engineering. Equipment installation and construction of the boiler house in operation according to the design documentation

Special circumstances:

  • Extremely short design and execution time
  • working in an operating boiler room
  • extreme work safety